Overall Solution for Open-pit Mine Intellectualization
Introduction
The overall construction idea of Huaxia Tianxin intelligent overall solution is "three 1+N", namely, 1 set of standard and specification system, 1 set of information infrastructure, 1 set of intelligent integrated management and control platform, and N intelligent subsystems.
1 set of standard and specification system: The standard and specification system is the communication bridge between the physical world and the virtual world of the intelligent mine, which can effectively break the information "barrier" between subsystems, laying the foundation for realizing data sharing, system integration, information fusion and linkage application of coal mine intelligent construction. 1 set of information infrastructure: Overall construction of network transmission platform, cloud data center and dispatching command center, opening up data transmission and utilization channels. 1 set of intelligent integrated management and control platform: Intelligent integrated management and control is the "intelligent brain" of coal mine. Based on the intelligent mine operating system platform (RED-MOS), it realizes the comprehensive perception data of "man-machine-ring" and the data fusion, interaction and sharing of multi-departments, multi-specialties and multi-management levels, and realizes the holographic display, integrated concentrated control, dispatching command, linkage control, disaster prediction and decision-making of coal mines. Really realize the integration of "monitoring, control and management" of coal mines. N intelligent subsystems: Through the intelligent construction or upgrading of production and auxiliary systems, as well as the construction of personnel positioning, intelligent individual equipment, inspection robots, etc. Based on all kinds of sensors, cameras, individual equipment, patrol inspection instruments, intelligent terminals and other equipment, the "human, machine, environment" information of the coal mine can be fully perceived and executed, so as to truly achieve the purpose of reducing personnel, improving efficiency, reducing cost and increasing efficiency, and intrinsic safety.

- Architecture diagram
- Construction content